The Zebra Design Sprint
Design Sprint 4.0 — one flow, one week, validated and shipped.
The Zebra Design Sprint
One flow. One week. Validated and shipped to your codebase.
This is a Design Sprint 4.0 — the fourth evolution of the methodology, rebuilt for an era where you ship code, not Figma. Every element in the process exists from feedback over 60+ client projects using this methodology.
The Lineage
| Version | Who | Era | What Changed |
|---|---|---|---|
| 1.0 | Jake Knapp / Google Ventures | 2010 | The original — Map, Sketch, Decide, Prototype, Test in 5 days |
| 2.0 | AJ&Smart (Berlin) | ~2016 | Condensed to 4 days, remote-friendly, facilitation-first |
| 3.0 | Deep Work Studio (Charlie (me!) + Andrej) | 2019 | Remote first, with deliverables for early-stage startups |
| 4.0 | Zebra Design (Charlie) | 2025 | AI-era execution — one flow shipped in code not Figma and user-validated in ~5 days |
Each generation got closer to the real thing. Sketches became prototypes. Prototypes became Figma. Figma became shipped code. Shipped code became validated with real users.
Who's it for
After iterating on the process with 60+ clients, the process is a perfect fit for pre-seed to seed stage startups needed the best in user experience and product design without hiring a dedicated designer.
Example One Sprint Structure
PRE-SPRINT: Prep & Onboarding
│ Review learnings, onboard attendees, technical access
↓
WORKSHOP: Alignment / Feedback / Scope Lock
│ Align stakeholders, involve domain experts,
│ eliminate feedback loops before they start
↓
BUILD: Days 2-5
│ Work directly in client codebase
│ Ship working flow, scope lock mid-sprint
↓
DELIVERABLE: Working flow + user test ready
│
════════════════════════════════════
ASYNC GAP (Client's Timeline)
Users complete tests over days/weeks
════════════════════════════════════
│
↓
USER TESTING: ICP-weighted analysis
│ Evidence over opinion
↓
UX FIXES: One-day iteration
│ Fix what testing revealed
│ Before next workshop or final presentation
↓
PRESENTATION: End of project
│ Evidence-first results, deliverables, next steps
↓
VALIDATED OUTCOME
Clients can work in multiple sprints for multiple user-flows, features and user validation rounds.
The Process
Each step is a module — use the ones that fit where you are in the project. Click through for the detailed guide.
| Guide | What It Covers |
|---|---|
| Project Setup | Review learnings, attendee selection, onboarding |
| Workshops | Alignment, scope lock workshop, feedback workshops — modular by sprint |
| Build & Prototype | Code before consensus, async communication, sprint protection rules |
| User Testing | Test protocol, ICP-weighted analysis, evidence over opinion |
| UX Fixes | Focused iteration day — fix what testing revealed |
| Presentations | Evidence-first results, deliverables, closing the engagement |
Principles
- Code before consensus — Build working software, get feedback on reality
- The structure says no — Scope freeze, time bounds, and process create boundaries
- Data decides — User testing as endpoint, not subjective approval
- Tested, fixed, improved — UX fixes turn findings into shipped improvements before presenting
- Recovery is methodology — Sustained quality requires structural rest
Why Zebra Sprints Exist
Design and code are being commoditised. Anyone can build an app now. The sustainable differentiator is knowing what to build, with UX working beautifully for humans and proving it works.
First engagement of the Design Sprint 4.0: 3 sprints, 55k lines of code, 173 components, 25+ screens. 9 user interviews across 2 rounds. Client: "I'm amazed. Unbelievable."
The sprint model delivers market value at a fraction of the cost because AI makes implementation fast — but knowing what to implement and validating it with real users is what saves months of wrong-direction engineering.